Sunday, February 10, 2013

More Terraces On Phase Two
 Constuction of terraces continues during January
 Being built on either side of the aspargus and strawberry beds which were built last year
 Every bit of soil moving generates more stones and rocks
0
 
Work spreading out from the "Bee Terrace"
Starting to look a bit like a collection of large window boxes without a window


 

Still no hand-rail though
Access steps for the strawberry bed
Cold frame proved very useful this winter
 

No comments:

Post a Comment