The middle of June saw the last flight of steps installed that would finally enable you to get to the "Sun Terrace". This was the section we had all been waiting for which would allow relatively easy access to what would be a level area of 2.4m x 10m.
The last 6 Steps |
Looking down give you an idea of what it looks like from the top, there is still more work to do with a banister and extra supports under the treads.
As this flight went in relatively easily with no rock to cut away a start was made leveling the top terrace properly and an area for a shed/workshop
Final Terrace |
Area for Workshop |
10 days later I was back up to build the shed/workshop
Work in Progress |
The Finished Shed/Workshop |
Planting June 2011 |
No comments:
Post a Comment