The main spring was in fine flow also, etching its way into the bank and in the process bringing soil and gravel down with it. To try and stop this a small wall/barrier was built with a hole at its base to put a halt to this erosion.
Lastly a small log store was built (about 2M²) and half filled with beech wood ready for the winter.
No comments:
Post a Comment