Sunday, September 15, 2013
The 2013 Spring and Summer projects
Heather bed prior to planting in April
Heather bed in September
Handrail now all the way up to the Bee Terrace
Looking down from the bee terrace, note the old cotoneaster by the plank on the right hand side of the shot
By September the cotoneaster reduced to a small bush and the "Pulpit" built
By September the cotoneaster reduced to a small bush and the "Pulpit" built
Completed "Pulpit" at the end of the path
The "Pulpit"
View of the garden from the harbour
Completed bike shed
Subscribe to:
Posts (Atom)